TIDEWATER HOME IMPROVEMENT LLCRemodeling & Construction · Hampton Roads, VA
Scope of Work & Estimate
6310 Adkins Rd · Providence Forge, VA
$4,451.25 Estimate
6310 Adkins Rd, Providence Forge, VA
LVP Flooring Kitchen Tile
Print / PDF Expires: 08/27/2026
Project Overview
Customer: Dwayne Ghee
Services: LVP Flooring + Kitchen Tile
Address: 6310 Adkins Rd, Providence Forge, VA
Flooring: Waterproof LVP (THI-provided)
LVP Area: 202.5 sf (removal) / 223 sf (installed)
Kitchen: 10×10 · 100 sf tile replace
Furniture: Moving included
Included Scope
10100General ConditionsIncluded
  • Jobsite protection, dust control, daily cleanup
  • Supervision and coordination of all work
  • Furniture moving — 2 bedrooms + kitchen (move out, protect, reset)
10101Trashout / DemolitionIncluded
  • Remove existing tile flooring — LVP areas (202.5 sf)
  • Remove existing tile flooring — Kitchen 10×10 (100 sf)
  • Subfloor prep — inspect, clean, level as needed
  • Complete haul-off and offsite disposal of all tile + debris
10117Flooring — Waterproof LVPIncluded
  • Install waterproof luxury vinyl plank (223 sf incl. waste)
  • Material: THI-provided waterproof LVP
  • 2 transition strips at doorways
10109Doors & Trim — Baseboards & Quarter RoundIncluded
  • New baseboards — ~90 lin ft (material + labor)
  • Quarter round — ~90 lin ft, nailed into baseboards (NOT the floor) to allow LVP expansion/contraction
  • Counter-sink finish nails, fill holes with wood filler, caulk top edges + inside corners
10116Tiling — KitchenIncluded
  • Install new tile flooring — Kitchen 10×10 (100 sf)
  • Mid-grade tile, standard layout (flag if premium tile selected)
10113Interior Painting — Touch-UpsIncluded
  • Touch-up paint on all nail fills, joints, and caulking lines for a clean finished appearance
10130Punch List & CompletionIncluded
  • Final walkthrough: vacuum floors with hard-surface attachment, inspect for gaps or defects
  • Client walkthrough for project sign-off
Payment Schedule — 50 / 50
Draw 1 — Deposit
50%
$2,225.63 upon signing
Draw 2 — Final
50%
$2,225.62 upon completion
Itemized Estimate — one all-in price per line
10100 — General Conditions$150.00
10101 — Demolition (LVP areas, 202.5 sf)$506.25
10101 — Trashout / Haul Away$150.00
10117 — Waterproof LVP (223 sf incl. waste)$1,115.00
10109 — New Baseboards (90 lf)$405.00
10109 — Quarter Round + Prep (90 lf)$225.00
10113 — Paint Touch-Ups$150.00
10130 — Punch List & Walkthrough$100.00
10101 — Demolition (Kitchen tile, 100 sf)$250.00
10116 — New Tile — Kitchen (100 sf)$1,200.00
10100 — Furniture Moving (2 BR + kitchen)$200.00
ESTIMATED PROJECT TOTAL$4,451.25
Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: All work described in the Included Scope above. Any work not listed is not included unless agreed in writing.

Flooring material: THI-provided waterproof LVP. If customer supplies LVP, flooring line is repriced at labor-only (~$480).

Tile: Mid-grade tile at the quoted rate; premium tile selections quoted separately.

Excluded: full-wall painting, premium tile upgrades.

Notes:
**Jobsite will be left clean once completed.

Warranty:
**12 months workmanship.

Payment Terms:
· Total Project Cost: $4,451.25
· Deposit to Schedule: $2,225.63
· Final Payment: $2,225.62

Check is the preferred method.
**You can pay by credit card using the link below.
https://request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment:
- Virtual Affirm credit card

Validity: one (1) week from the date above.